Private residence
→Harewood Gardens
2023Hampstead, London
An 1890s bank hall converted to workspace, with the original scagliola columns conserved rather than clad.
The developer's first scheme boxed the columns in plasterboard. We proposed conservation instead, priced it against the cladding package, and it came in under — because the columns needed consolidation, not replacement.
Twelve scagliola columns were cleaned with a conservation-grade poultice, filled with a reversible resin, and repolished to a full gloss. The colour reinstatement was signed off by the conservation officer on first inspection.
The banking hall ceiling was surveyed with photogrammetry, its lost enrichments cast from a surviving bay, and 71 units installed across four weeks.
A site visit, a written condition note, and an honest answer about what the room needs.
Book a survey→